College Park, Conway, and the older east-side streets still have Federal Pacific and Zinsco load centers that were ordinary when those houses were new. The insurance letter is usually written somewhere else. The work is governed by whichever city sits on the parcel and by whichever utility owns the meter.
Those two systems do not match. City of Orlando electrical work is an ELE permit through Permitting Services and ProjectDox. Unincorporated Orange County is Fast Track at the Division of Building Safety. OUC’s published meter rules and Duke Energy’s contractor sealing policy are different documents. A helper with a van is not the person who can print either permit.
Kissimmee and Sanford are nearby on a map and not the same packet. Kissimmee is Osceola County and, for much of the city, Kissimmee Utility Authority. Sanford is Seminole County. This page stays on Orlando and Orange County.
What OUC and Duke actually wrote
OUC’s Electric Service and Digital Meter Installation requirements are blunt: remove a meter-base seal without OUC authorization and the account gets a $100 charge. The 2026 tariff and OUC’s public rates page repeat that Cut Seal Trip Charge and give a panel upgrade as the example. That is not a DIY path. The electrician coordinates the disconnect with OUC so the seal cut is authorized.
Duke Energy Florida’s April 2026 Service Requirements Manual says a licensed electrical contractor shall notify the company before breaking and removing the meter seal, then notify the company immediately after the work so Duke can re-inspect and replace the seal. The same manual says company-owned meters are not for the customer to pull. The contractor notice is the published exception, not a homeowner exception.
Neither utility publishes a guaranteed outage window. Spectrum’s 2026 Orlando article describes a same-day or 24-hour disconnect ticket and a one-day install. Treat that as contractor language.
Winter Park Electric is a third logo. Read the bill before the estimate.
Permits inside the city and in the county
Inside Orlando city limits, start at Permitting Services (400 South Orange Avenue). Their Get-a-Permit page runs through an application, digital plans in ProjectDox, a recorded Notice of Commencement if the job is over $5,000, fees, then inspections until the permit is final. The forms page has a dedicated Electrical (ELE) Permit Application, a contractor-registration form, and an owner-builder declaration that has to be filled out in person at City Hall.
In unincorporated Orange County, the county’s own “Do I Need a Permit” page answers the panel question in one line: yes, you need an electrical permit to change out the panel or upgrade service, and a final inspection has to pass. Licensed contractors apply in the scope of their license through Fast Track. A homeowner may apply only for a primary residence after owner-builder verification.
Spectrum’s 2026 guide cites Florida Building Code (8th Edition, 2023) and Orange County Code Chapter 9 and puts typical county permit fees at $150–$300. Confirm the current fee on the counter that actually covers the house.
Price, without inventing one
Three Orlando-area contractor pages publish installed bands. Spectrum’s 2026 article says a typical 200-amp upgrade is $1,500–$3,000, with 400-amp work at $3,000–$5,500+. Palmer’s panel-replacement FAQ puts a typical interior main-panel swap at $2,000–$2,500. Happy Home’s FAQ widens replacement to $1,500–$4,000 and 100A-to-200A to $1,800–$3,000. Those are three published bands, not an average we made up.
Florida license lookup is public. Ask for the EC (certified, statewide) or ER (registered, local) number and check it on DBPR before you sign. Three shops met both bars on their own sites and matched Current/Active certified electrical records on myfloridalicense.com: Spectrum EC13008455, Florida Electrical Services EC13007069, and Palmer EC0003096. Palmer’s FPE/Zinsco copy is on the panel-replacement page; EC0003096 is also printed on their homepage with a link to the state lookup.
Happy Home writes about Federal Pacific and Zinsco and publishes prices, but the pages we fetched never print an EC or ER number — cost source only. Al-Air names Stab-Lok and Zinsco without a license number. Thomas Edison Electric’s Orlando site names FPE/Zinsco and prints EC13015487, but it is one of several cookie-cutter Florida city domains on the same license; we could not pull a clean official DBPR detail page in this review, so the shop is omitted rather than guessed. Directory-only listings are omitted. None of the listed shops is affiliated with Panel Letter.
What to hand the carrier
The useful packet is the closed city or county electrical permit, the passed inspection, an invoice with the EC number on it, and photos if the letter asks. Spectrum’s Orlando panel page talks about satisfying insurance requirements after an FPE or Zinsco swap. If your electrician produces a load calculation or a labeled panel schedule, send that too. We did not find a Florida carrier page that publishes a single national “sticker” form. Ask the agent what they will actually open.
Typical replacement cost
$1,500–$3,000 is the published Orlando 200-amp band on one 2026 contractor page
$1,500–$3,000
Typical 200-amp panel upgrade in the Orlando area
Their 2026 Orlando guide also lists 400-amp work at $3,000–$5,500+ and Orange County permit fees at $150–$300. They describe most 200-amp upgrades as a one-day job after the permit is pulled. Treat the fee line as contractor notes, then confirm on the city or county schedule.
Source: Spectrum Electric Inc.$2,000–$2,500
Typical interior main-panel replacement with all-new breakers in Orlando
Palmer’s own FAQ. They do not publish a separate Federal Pacific-only number on that page.
Source: Palmer Electric Company$1,500–$4,000
Electrical panel replacement in Orlando, including permit fees
Same FAQ puts 100A-to-200A work at $1,800–$3,000. They advertise Federal Pacific and Zinsco replacement on that page but do not print an EC or ER number, so they are a cost source only.
Source: Happy Home Electric
Permit
Who pulls it: City of Orlando electrical work uses an Electrical (ELE) permit application, submitted through the city’s digital-permit path. Contractors register with the city. An owner-builder declaration has to be completed in person at City Hall. Orange County’s “Do I Need a Permit” page says an electrical permit is required to change out a panel or upgrade service, that licensed contractors may apply within the scope of their license, and that a homeowner may apply only for a primary residence after owner-builder verification.
Kissimmee is Osceola County and, for much of the city, Kissimmee Utility Authority — a different permit office and a different utility. Sanford is Seminole County. Winter Park runs its own municipal electric. Those are not the City of Orlando / Orange County story. A quote that only says “we handle the permit” should name the city on the address. Florida statewide licensing is through DBPR; city or county registration is an extra step.
Utility coordination
Orlando Utilities Commission (OUC) for most of the City of Orlando and parts of unincorporated Orange County; Duke Energy Florida for much of the rest of the county
Who disconnects: OUC’s Electric Service and Digital Meter Installation requirements say removing a meter-base seal without OUC authorization adds a $100 charge. OUC’s 2026 tariff and its public rates page name that same $100 Cut Seal Trip Charge and give panel upgrades as an example of unauthorized seal cutting. Duke Energy’s April 2026 Service Requirements Manual says a licensed electrical contractor shall notify the company before breaking and removing the meter seal, then notify the company immediately after the work so Duke can re-inspect and replace the seal. Company-owned meters are not for homeowners to pull.
Outage window: Neither OUC nor Duke publishes a guaranteed “power off for X hours” figure for a residential panel swap. Spectrum’s 2026 Orlando guide describes a same-day or 24-hour disconnect ticket and a one-day install, with county inspection usually in 1–3 business days. Happy Home describes four to eight hours of electrical work. Those are contractor field notes, not a utility SLA.
Confirm the logo on the bill. OUC’s Development Services Guide says OUC provides electric inside the City of Orlando and in parts of unincorporated Orange County. Duke Energy Florida covers much of the remaining county. Winter Park Electric and Kissimmee Utility Authority are separate municipals. A 100A-to-200A upgrade is a utility coordination job as well as a city or county permit.
What to hand the insurer
- Closed City of Orlando or Orange County electrical permit
- Passed inspection / AHJ sign-off
- Invoice showing the Florida electrical contractor license (EC or ER)
- Photos of the old and new panel if the carrier’s letter asks for them
- Load calculation or panel schedule if the electrician produced one
Ask your agent for the exact list. Carriers do not publish a single national checklist.
Electricians who advertise this job
A shop is listed only if it advertises Federal Pacific, Zinsco, or insurance-driven panel replacement on its own site and prints a license number there. Trade-association locators already exist. We will not pad this list. Verify the license before you hire.
Spectrum Electric Inc.
Casselberry / Winter Springs, FL
Published license: EC13008455 (Florida DBPR)
Orlando panel-upgrade page that names Federal Pacific Stab-Lok and Zinsco as insurance-flagged fire hazards and prints EC13008455.
Their siteFlorida Electrical Services and Contracting LLC
Orlando, FL
Published license: EC13007069 (Florida DBPR)
Central Florida breaker-panel replacements that specialize in Federal Pacific FPE and Zinsco change-outs, with License
Their sitePalmer Electric Company
Winter Park, FL
Published license: EC0003096 (Florida DBPR)
Dedicated Zinsco and Federal Pacific Electric (FPE) Stab-Lok replacement copy for Orlando and Central Florida, plus a published interior-panel price band.
Their siteHow this page was built
Compiled by Panel Letter on 2026-09-01 from the public pages below. If a fact was not on a cited page, it is marked as unverified in the copy. This is a research guide, not a bid.
- Spectrum Electric, Electrical panel upgrades in Orlando
Federal Pacific / Zinsco insurance language and EC13008455.
- Spectrum Electric, Electrical panel upgrade in Orlando 2026
$1,500–$3,000 200A band, $3,000–$5,500+ 400A, Orange County permit-fee observation, EC13008455.
- Florida Electrical Services, Electric panel upgrades
Federal Pacific / Zinsco replacement advertising and EC13007069.
- Palmer Electric, Electrical panel replacement in Orlando
FPE/Zinsco replacement copy and $2,000–$2,500 interior-panel range.
- Palmer Electric, homepage license line
Prints EC0003096 and points homeowners to myfloridalicense.com.
- Florida DBPR, Spectrum Electric EC13008455
Certified Electrical Contractor, Current/Active.
- Florida DBPR, Florida Electrical Services EC13007069
Certified Electrical Contractor, Current/Active, Orlando address.
- Florida DBPR, Palmer Electric EC0003096
Certified Electrical Contractor, Current/Active, Winter Park.
- Florida DBPR, Verify a Licensee
Official Florida electrical-contractor lookup.
- City of Orlando, Get a Permit
Official city permit path, ProjectDox, Notice of Commencement over $5,000.
- City of Orlando, Permitting forms
Electrical (ELE) permit application, owner-builder declaration, contractor registration.
- Orange County, Do I Need a Permit
Electrical permit required to change out a panel or upgrade service; who may apply.
- Orange County Fast Track
County online permitting portal.
- OUC, Development Services Guide
OUC electric inside the City of Orlando and parts of unincorporated Orange County.
- OUC, Electric service and digital meter installation
Unauthorized meter-base seal removal is a $100 charge.
- OUC, Service rates and costs
Public $100 Cut Seal Fee.
- OUC, 2026 tariff book
Cut Seal Trip Charge language that names panel upgrades as an example.
- Duke Energy, Service Requirements Manual (April 2026)
Licensed-electrician notice before breaking a meter seal; reseal after the work.